Azure Minerals completed the drilling of the Oposura lead-zinc mine in Mexico and made significant discoveries.

- Apr 16, 2018-

With underground development, a diamond drilling rig will be used to collect pre-feasibility data needed to assess the potential for the full development of the DaVinci vein, which will in turn re-evaluate the entire Deflektore mine. The length is about 1 km.


Azure Minerals completed the drilling of the Oposura lead-zinc mine in Mexico and made significant discoveries.


The eastern section saw 5.5 meters of minerals, 20.9% of lead and zinc grades, and another 9.6 meters thick, with 18.2% lead and zinc mineralization.


The drilling work will be expanded from 7000 meters to 10006 meters.


It is expected that in the third quarter, the company will complete a summary study and preliminary economic evaluation.